Oregon Oversize Load Regulations and Permits

Oregon oversize rules: legal limits (8 ft 6 in wide, 14 ft high), pilot cars by route color, night and holiday limits and ODOT permits in ORION.

Updated 5 min read

Legal width
8 ft 6 in
Legal height
14 ft
Semitrailer length
53 ft
On Group 1 highways and Route Map 7 routes; 40 ft on Group 2 and 3 highways
Gross weight
80,000 lb
First escort, Interstates
Over 14 ft wide
Superload from
Over 16 ft wide
Over 14 ft on two-lane highways, 17 ft high or 150 ft long
Night moves
Up to 12 ft wide
Over 10 ft on Interstates only
Superload permit time
Up to 10 days

Permits issued by

ODOT Commerce and Compliance Division, Over-Dimension Permit Unit

Apply online
ORION
Office hours
Mon–Fri 7:00 a.m.–5:00 p.m. Pacific
On this page

In Oregon, a truck and load can be 8 ft 6 in wide, 14 ft high and 80,000 lb gross without a permit, with a 53 ft semitrailer on Group 1 highways and designated routes. Anything bigger or heavier needs a variance permit from the Oregon Department of Transportation (ODOT) Commerce and Compliance Division (CCD). You order it in ODOT's online system, Oregon Routing Information Online (ORION), or through the Over-Dimension Permit Unit at (503) 373-0000.

Oregon routes oversize loads by map. ODOT's Route Map 2 marks each state highway green, purple or red, and that color, with the load's width, sets how many pilot vehicles you need. Attachment H, which comes with the permit, sets when a wide load can move: night limits, city rush hours, summer weekends and holiday windows that often run through the weekend.

Key points:

  • Interstates need no pilot vehicle up to 14 ft wide, but some red two-lane routes need two from 8 ft 7 in.
  • Superloads start over 16 ft wide on multilane highways, over 14 ft wide on two-lane highways, over 17 ft high or over 150 ft long. ODOT says a superload permit can take up to 10 days.
  • Loads over 12 ft wide can't move at night, and loads over 14 ft wide stay off the road at rush hour and midday in Portland, Salem, Eugene, Grants Pass and Medford.
  • For Thanksgiving 2026, loads over 8 ft 6 in wide stop at noon Wednesday, November 25. Full movement resumes a half-hour before sunrise Monday, November 30.
  • A permit costs $8. Non-divisible loads over 98,000 lb also pay a road use assessment fee.

These are the most a truck and load can measure and weigh on Oregon highways without a permit, under chapter 818 of the Oregon Revised Statutes (ORS) and ODOT's Oregon Administrative Rules (OAR).

LimitLegal in OregonWhere it comes from
Width8 ft 6 inORS 818.080
Height14 ft, including loadORS 818.080
Semitrailer length53 ft on Group 1 highways and Route Map 7 routes; 40 ft on Group 2 and Group 3 highwaysOAR 734-071-0010; ODOT Group Map 1
Tractor-semitrailer overall length60 ft on Group 1, 2 and 3 highways. On Route Map 7 routes with a semitrailer up to 53 ft: no overall limit on green and brown routes, 65 ft on purple and black routes, 60 ft on blue routesOAR 734-071-0010, Tables 1 and 2; ODOT legal vehicle dimensions
Truck and trailer75 ft overall on Group 1 highwaysODOT Group Map 1
Single-unit truck length40 ftORS 818.080
Load overhang4 ft past the front; at the rear, three-fourths of the wheelbase on a single truck or one-third of the wheelbase on a combination, or up to 5 ft past the trailer in most casesORS 818.080; ORS 818.100; ODOT legal vehicle dimensions
Gross weight80,000 lbORS 818.010
Axle weights20,000 lb single, 34,000 lb tandem; no more than 600 lb per inch of tire widthORS 818.010

Oregon's trailer limit depends on the highway. ODOT's Group Map 1 sorts state highways into Groups 1, 2 and 3, and only Group 1 highways and designated Route Map 7 routes take a 53 ft semitrailer without a permit. ODOT's Legal Vehicle Dimensions page lists unlimited overall length on all designated routes, but the rule's Route Map 7 table limits purple and black routes to 65 ft and blue routes to 60 ft, so check the route color. With an annual Extended Weight permit, tractor-semitrailers, truck-trailers and doubles can carry divisible loads up to 105,500 lb gross.

The 14 ft legal height doesn't guarantee clearance. ORS 818.080 leaves the driver and owner responsible for checking vertical clearance on the route.

How large an Oregon oversize permit load can be

Oregon's permit rules set no single statewide width limit. The route color on Route Map 2 sets how wide a load can go before it needs district approval.

  • Width: Route Map 2's pilot chart covers loads up to 16 ft wide on Interstates, multilane highways and green two-lane routes, 14 ft on purple routes and 12 ft on red routes. Wider loads need ODOT district approval case by case, except on Interstates and multilane highways. There, ODOT's district guidelines allow 16 ft 1 in to 18 ft in most districts, and up to 20 ft in some, including those covering I-84 from Hood River east, with two pilot vehicles. In ODOT's eastern Oregon region, 22 ft is the widest load allowed on a freeway for any substantial distance; 22 to 26 ft may be allowed only for freeway hauls of 5 miles or less.
  • Height: ODOT routes over-height loads to keep at least 4 in of clearance under the lowest measured point of every structure, unless it approves less for a single move (OAR 734-082-0025).
  • Length: a trailer over 53 ft is permitted case by case when the load's size or weight requires it, such as on a stretch or expandable trailer (OAR 734-082-0045).
  • Axle weights: the permit assigns a weight table, with no more than 21,500 lb per axle and 43,000 lb per tandem. A rig with a steering axle and four or more tandems can carry up to 24,000 lb per axle and 48,000 lb per tandem under Weight Table 5. Anything heavier needs an engineering review by ODOT's Bridge Section, valid for that one move (OAR 734-082-0015).
  • Validity: a single-trip permit covers one trip within 10 consecutive days. Continuous-trip permits are capped at 98,000 lb.

When an Oregon load becomes a superload

ODOT treats a load as a superload when it's over 16 ft wide on an Interstate or multilane state highway, over 14 ft wide on any state two-lane highway, over 17 ft high or over 150 ft long. Mobile homes count from a box over 14 ft wide or an overall width over 15 ft. ODOT says a superload permit can take up to 10 days, and longer in special circumstances.

The request needs contact details, the move date, the commodity, loaded dimensions, axle spacings and weights, the route, travel speeds and vehicle details. Send a diagram when the load, trailer or axle width exceeds 16 ft.

ODOT can add conditions before it issues the permit:

  • a route survey, which ODOT's regional electrical crews can require because the permit unit checks structures and overpasses but not signal or utility lines;
  • a traffic control plan using Oregon-certified flaggers alongside your pilot cars;
  • a monitored move, with ODOT staff on site and any signal or utility work billed to the carrier.

Superload drivers need at least three years of experience driving combination vehicles, including one year hauling oversize loads, and a clean recent record.

Oregon escort and pilot car requirements

ODOT sets the minimum number of pilot vehicles by the load's size and the route's color on Route Map 2. This table shows the statewide chart printed on Route Map 2 and in ODOT's overwidth permit conditions as of November 2026.

LoadInterstate or multilane highwayTwo-lane green routeOther two-lane routes
8 ft 7 in to 9 ft wideNoneNoneNone on purple routes
9 ft 1 in to 12 ft wideNoneNone1 on purple routes
12 ft 1 in to 14 ft wideNone12 on purple routes
14 ft 1 in to 16 ft wide12Set on the permit
Over 16 ft wideSet on the permitSet on the permitSet on the permit
95 ft 1 in to 110 ft longNoneNone1
110 ft 1 in to 120 ft longNone11
120 ft 1 in to 150 ft long1 rear22
Over 150 ft longSet on the permitSet on the permitSet on the permit
Over 14 ft 6 in high1 front with a height pole1 front with a height pole1 front with a height pole
Front overhang over 15 ftNone11

Red routes need pilot vehicles at narrower widths, from 8 ft 7 in on some highways, so check Route Map 2 and Group Map 1. A single pilot vehicle runs in front of the load, except on multilane highways, where it runs behind. With two, one runs in front and one behind, 300 to 500 ft from the load. If the permit specifies a different number, the permit wins.

For a load over 14 ft 6 in high, you can file a height declaration with CCD accepting liability for any damage instead of running a front pilot vehicle with a height pole. For loads over 12 ft wide, Oregon requires certified flaggers at 17 listed tunnels and bridges, such as the Sunset Tunnel on US 26 and the Yaquina Bay Bridge on US 101. The alternative is a certified rolling stop with three pilot vehicles.

Oregon pilot vehicles must:

  • be a passenger car, pickup, truck or truck-tractor of legal size and weight, towing nothing;
  • carry a roof-mounted "OVERSIZE LOAD" sign at least 5 ft wide and 10 in high, with 8 in black letters on yellow;
  • run amber flashing, revolving or strobe lights above the roof, visible from 500 ft, with at least 30 flashes a minute;
  • keep two-way radio contact with the truck, and carry two 18 in red flags on 3 ft staffs and eight flares or reflectors.

Oregon's pilot vehicle rule (OAR 734-082-0035) doesn't require an operator certificate. A pilot vehicle operator who directs traffic in a rolling stop must complete ODOT's traffic control training and repeat it every three years (OAR 734-070-0060).

When oversize loads can move in Oregon

Attachment H sets Oregon's travel times by load width, so the same load can be legal on an Interstate at night and banned on a nearby two-lane road.

TimeUp to 10 ft wide10 ft 1 in to 12 ft wide12 ft 1 in to 14 ft wideOver 14 ft wide
Night, from a half-hour after sunset to a half-hour before sunriseInterstates and green routesInterstates onlyNot allowedNot allowed
Business days, 7 to 9 a.m. and 4 to 6 p.m., in Portland, Salem, Eugene, Grants Pass and MedfordAllowedAllowedInterstates only, except I-5 from Washington to OR 217 and I-5 Exits 24 to 33Not allowed
Summer weekends, after noon Saturday and all day SundayInterstates and authorized routes east of the CascadesSameSameNot allowed

Loads over 14 ft wide also can't move from 11 a.m. to 1 p.m. in those five urban areas. Around Portland, the weekday rush-hour ban for loads over 14 ft also covers I-5 from Washington to milepost 278, I-84 to milepost 15, all of I-205 and US 26 (Sunset Highway) out to milepost 64. Summer weekends run from Memorial Day to Labor Day, not counting the holiday weekends themselves.

Daylight in Oregon means a half-hour before sunrise to a half-hour after sunset. Loads over 8 ft 6 in wide can't move when roads are icy, snowy or frosty, when visibility is under 500 ft, when wind makes the load sway, or where ODOT posts restriction signs (OAR 734-082-0023).

Oregon holiday restrictions

Oregon restricts loads over 8 ft 6 in wide around New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas. Martin Luther King Jr. Day, Presidents Day, Juneteenth and Veterans Day aren't restricted. The ban starts at noon on the day before the holiday, and when the holiday falls on a Monday or Friday, or at Thanksgiving, it covers the weekend.

ODOT published these windows for non-divisible loads:

HolidayNo movement over 8 ft 6 in wideException for loads up to 14 ft wide
Thanksgiving, Thursday, November 26, 2026Noon Wednesday, November 25, to a half-hour before sunrise Monday, November 30Thursday through Saturday on authorized routes
Christmas, Friday, December 25, 2026Noon Thursday, December 24, to a half-hour before sunrise Monday, December 28Friday and Saturday on authorized routes
New Year's Day, Friday, January 1, 2027Noon Thursday, December 31, 2026, to a half-hour before sunrise Monday, January 4, 2027Friday and Saturday on authorized routes

In daylight, the authorized holiday routes are any Interstate, US 97, and the black routes on Route Map 6 or Route Map 9 east of US 97. Sunday stays closed. The permit office closes at 5 p.m. on the business day before each holiday and reopens at 7 a.m. on the next business day, so for Thanksgiving it's closed from 5 p.m. Wednesday, November 25, until 7 a.m. Monday, November 30.

How to get an Oregon oversize permit

Oregon over-dimension permits are ordered in ORION, ODOT's self-service permit system.

  1. Open a CCD account. You need one before you can open an ORION account. Apply online through Oregon Trucking Online or call the Tax Service Center at (503) 378-6699.
  2. Cover the weight-mile tax. A truck over 26,000 lb combined needs Oregon weight-mile tax enrollment or a temporary pass, even when the whole trip runs on a single-trip permit. A temporary pass costs $9 plus the weight-mile tax for each mile and lasts 10 days.
  3. Apply in ORION. Give the power unit's year, make, VIN and unit number, the load's dimensions and weights, and the route. ODOT won't issue a permit on an incomplete application. County roads can be added, but they may delay the permit.
  4. Pay. Fees are due when the permit issues, and ORION calculates any road use assessment fee automatically.
  5. Carry the permit and its attachments. These include Attachment H and, when flaggers are required, the certified flagger attachment.

Oregon oversize permit fees

Oregon sets the permit fee and the road use assessment fee by statute (ORS 818.270 and 818.225).

Permit or feeAmount
Single-trip or annual permit, state administrative fee$8
Extra fee when a private permit agent issues the permitUp to $5
County administrative fee, annual permitUp to $8 per county
Road use assessment fee, single-trip non-divisible load over 98,000 lb10.9 cents per ESAL mile
Temporary weight-mile tax pass$9, plus weight-mile tax per mile

An equivalent single-axle load (ESAL) compares the rig's weight with an 18,000 lb single axle, so the road use assessment fee rises with gross weight, axle count and miles (ORS 818.225). The fee replaces the weight-mile tax on the loaded miles. Administrative fees aren't refundable, and the road use assessment fee is refunded only if the trip isn't made.

Planning an oversize move through Oregon

Oregon's 14 ft legal height and 8 ft 6 in width match Washington, Idaho, Nevada and California. Trailer length is the difference. Oregon takes a 53 ft semitrailer only on Group 1 highways and designated routes, with 40 ft on Group 2 and 3 highways. Washington allows 53 ft, Idaho 53 ft on the National Network and approved state highways (48 ft elsewhere), Nevada 53 ft with longer trailers under a 70 ft overall limit, and California 53 ft on STAA routes with a kingpin-to-rear-axle distance of 40 ft or less. Compare every state on the route in our Washington oversize permit guide, California oversize permit guide and the legal limits in all 50 states.

Rules change at the Columbia River. Washington requires certified pilot car operators and Oregon's rules don't. Washington's Thanksgiving ban ends with the day after Thanksgiving, while Oregon's runs to Monday morning. Plan I-5 and I-205 crossings around both states' rush-hour limits.

Lead time in Oregon comes from approvals, not paperwork. A load inside the Route Map 2 limits can be permitted in ORION, but ODOT says a superload permit can take up to 10 days, and longer in special circumstances. District approvals, route surveys and traffic control plans all take time to arrange. A wide load also needs a schedule built around Attachment H: no night moves over 12 ft, no city rush hours over 12 ft on most roads, and no summer weekends west of the Cascades off the Interstates.

Moving a load into, out of or across Oregon? Request a heavy haul quote with the dimensions, weight and route, or see our over dimensional freight service.

Sources

Official sources, each checked on November 20, 2026.

  1. 1.ODOT: Over-Dimension Operations in Oregon
  2. 2.ODOT: Legal Vehicle Dimensions
  3. 3.ODOT: Group Map 1 designations list and legend, with legal lengths by highway group (form 735-8100, April 2026)
  4. 4.ODOT: Oregon Superloads
  5. 5.ODOT: Route Map 2 designations list and legend, with pilot vehicle charts (form 735-8101, May 2026)
  6. 6.ODOT: General Conditions for Oregon Overwidth Permits (revised November 9, 2026)
  7. 7.ODOT: State and District Guidelines: Pilot Cars and Other Special Requirements (May 2026)
  8. 8.ODOT: Special Transportation Permit Attachment H: Hauling Hours and Days for Overwidth Movement (form 2362, revised January 2026)
  9. 9.ODOT: Oregon Travel Restrictions and Guidelines, with 2026 and 2027 holiday restrictions
  10. 10.ODOT: Road Use Assessment Fee (RUAF)
  11. 11.ODOT: Get a Temporary Weight-Mile Tax Pass
  12. 12.ODOT: CCD Programs and Services (Over-Dimension permit contacts)
  13. 13.ODOT: CCD Hours and Closures
  14. 14.Oregon Legislature: ORS Chapter 818: Vehicle Limits (§§ 818.010, 818.080, 818.100, 818.225 and 818.270)
  15. 15.Oregon Secretary of State: OAR 734-082: Variance Permits Issued for Non-Divisible Loads and Road Use Assessment Fees
  16. 16.Oregon Secretary of State: OAR 734-071: Lengths of Vehicles, Loads and Combinations Without Special Permit (§ 734-071-0010)
  17. 17.ODOT: Division 71 Tables 1 and 2: maximum lengths by highway group and Route Map 7 route (OAR 734-071-0010)
  18. 18.Oregon Secretary of State: OAR 734-070-0060: Pilot Vehicle Operator Traffic Control
  19. 19.WSDOT: Curfew hours & holiday restrictions (Washington side of the Columbia River)
  20. 20.Washington State Legislature: WAC 468-38-100: Pilot/escort vehicle and operator requirements

Fide Freight is a member of the Specialized Carriers & Rigging Association (SC&RA).