In Maryland, a truck and load can be 8 ft 6 in wide, 13 ft 6 in high and 80,000 lb gross without a permit. A semitrailer can be 53 ft long on Interstates and designated truck routes, and 48 ft elsewhere. Anything bigger or heavier needs a hauling permit from the Maryland Department of Transportation State Highway Administration (MDOT SHA). You order it online in the Maryland One permit system, and the Hauling Permits Unit answers at (800) 846-6435.
The Maryland Transportation Authority (MDTA) runs the state's toll bridges and tunnels, and they set their own limits. The Baltimore Harbor Tunnel takes nothing over 8 ft wide or 13 ft 6 in high, and the Fort McHenry Tunnel nothing over 11 ft wide. The Francis Scott Key Bridge has been closed since it collapsed in March 2024. Settle the route around Baltimore and across the Chesapeake Bay before you promise a delivery date.
Key points:
- One escort starts at over 13 ft wide, 85 ft long or 120,000 lb, or at 14 ft 6 in high with a pole car. Two escorts start at 14 ft wide or 140 ft long.
- A load 16 ft wide or more, or over 150,000 lb, also needs a police escort.
- Loads 14 ft wide or more move only from 9 a.m. to 3:30 p.m. As of November 2026, loads up to 225,000 lb, 13 ft 11 in wide, 14 ft 6 in high and 139 ft long can move 24/7 with a passing route.
- No permit loads move from noon November 25 to 9:00 a.m. November 30, 2026, for Thanksgiving.
- MDOT SHA's fee table starts at $30 and adds $5 for each ton over 45 tons.
Maryland legal limits without a permit
These are the most a truck and load can measure and weigh on Maryland highways without a hauling permit.
| Limit | Legal in Maryland | Where it comes from |
|---|---|---|
| Width | 8 ft 6 in (102 in), including the load | Md. Code, Transp. § 24-102 |
| Height | 13 ft 6 in, including the load | Md. Code, Transp. § 24-104 |
| Semitrailer length | 53 ft on Interstates and designated State highways, with no more than 41 ft from the kingpin to the center of the rear tandem; 48 ft elsewhere | Md. Code, Transp. §§ 24-104.1 and 24-104.2 |
| Overall length | No overall limit for a truck tractor and one semitrailer | Md. Code, Transp. § 24-104.1 |
| Single truck length | 40 ft | Md. Code, Transp. § 24-104.1 |
| Indivisible load length | Up to 70 ft on a combination, in daylight | Md. Code, Transp. §§ 24-104.1 and 24-105; MDOT SHA |
| Load overhang | 3 ft past the front; 6 ft past the rear of the bed or body | Md. Code, Transp. § 24-105 |
| Gross weight | 80,000 lb within the bridge formula; 66,000 lb on four axles and 55,000 lb on three or fewer | Md. Code, Transp. § 24-109 |
| Axle weights | 20,000 lb single axle on a vehicle registered over 73,000 lb (22,400 lb at 73,000 lb or less); 34,000 lb tandem; larger groups by the bridge formula | Md. Code, Transp. §§ 24-108 and 24-109 |
A 13 ft 6 in height doesn't guarantee clearance. MDOT SHA's route restrictions list includes lower spots, such as the CSX bridge at MD 51 and Virginia Avenue in Allegany County, where trucks over 13 ft are barred. Check the list against your route.
How large a Maryland oversize permit load can be
Maryland's permit tiers turn mostly on weight, under the Code of Maryland Regulations (COMAR).
- Up to 120,000 lb: MDOT SHA can issue the permit without an engineering structural review of the bridges on the route.
- 120,000 to 150,000 lb: also no review, if the route needs none and the axles meet MDOT SHA's limits. Those are 20,000 lb on the steer axle, 27,000 lb on a single axle, and 26,000, 21,000 and 18,000 lb per axle on tandems, tridems and groups of four or more. The inner bridge must be at least 30 ft.
- Over 150,000 lb: only after an engineering structural review.
- Axles: 27,000 lb per axle at most. A combination with at least 15 axles that still can't get under that limit can go up to 36,000 lb per axle after a bridge analysis.
- Height: a load 14 ft 6 in or taller needs a height clearance route survey with the application and a pole car in front.
- Automatic issue: Maryland One issues permits automatically for loads up to 225,000 lb and 139 ft long with a passing route. As of November 2026, those limits were raised from 200,000 lb and 120 ft.
- Attachments: buckets, blades or scoops over 12 ft wide must come off and travel on another vehicle.
- Speed: a load over 45 tons must travel at least 10 mph under the posted speed limit.
A special hauling permit covers a single one-way trip on the route printed on it. You can extend it once, for 5 consecutive days, for $5, if you ask before it expires.
When a Maryland load becomes a super load
MDOT SHA treats a load over 150,000 lb gross as a super load. It needs an engineering review of the bridges on the route, plus police and private escorts. After MDOT SHA approves the application, you activate the permit: reopen it in Maryland One, add the driver's name and phone number, and resubmit it for final approval.
COMAR sets the minimum lead times:
- Over 60 tons (120,000 lb): apply at least 10 business days before the move.
- Over 250 tons (500,000 lb): apply at least 30 business days ahead.
- Excessive size, meaning 16 ft or more high or wide, or 100 ft or more long: apply at least 2 working days ahead.
MDOT SHA can also require bonds to cover its route studies and any damage before it issues a permit for these loads.
Maryland escort and pilot car requirements
Maryland calls pilot cars "escort vehicles," and COMAR sets the triggers by size, weight and road.
| Load | Private escorts |
|---|---|
| Over 13 ft wide (manufactured housing excepted) | 1 |
| 14 ft wide or more | 2: 1 ahead and 1 behind |
| Over 85 ft long | 1 |
| 140 ft long or more | 2: 1 ahead and 1 behind |
| 14 ft 6 in high or more | 1 pole car ahead |
| Over 60 tons (120,000 lb) | 1 |
| Construction equipment over 12 ft wide, off the Interstate system | 1 |
| Over 12 ft wide on a two-lane undivided road in Prince George's or Montgomery County | 2: 1 ahead and 1 behind |
| A road too narrow for traffic to pass, or traffic stopped or diverted | 2 |
| 16 ft wide or more, or over 75 tons (150,000 lb) | Police escort, plus private escorts |
A single escort rides behind the load on a highway with two or more lanes in your direction, and ahead of it on a two-lane highway. With two escorts, one leads and one follows, each within 300 ft of the load.
Maryland escort vehicles must:
- keep two-way radio contact with the truck;
- run at least one rotating or oscillating yellow roof light, 3 in or more across, visible front and rear;
- keep headlights on during the move;
- carry a "WIDE LOAD" or "OVERSIZE LOAD" sign at least 5 ft wide and 12 in high, with 8 in letters, on the roof or on the front and rear.
Each escort can accompany only one load. Permit loads keep 1/2 mile apart, or 1 mile when escorted. Maryland's escort rules set equipment and positions but don't call for driver certification. The truck itself needs "WIDE LOAD" or "OVERSIZE LOAD" signs, 7 ft wide and 18 in high, front and rear once it's over 9 ft wide.
When Maryland requires a police escort
Maryland requires a police escort, on top of private escorts, for any load 16 ft wide or more or over 75 tons (150,000 lb). MDOT SHA can also require one for loads of 65 to 75 tons, for moves that stop or divert traffic, or for moves that take up two lanes.
Schedule the Maryland State Police escort with the barrack in the county where the trip begins. If your permit also calls for Baltimore City Police or MDTA Police, book those separately. The permit holder pays the police costs. Crossing the Chesapeake Bay Bridge, any load over 10 ft wide needs a police escort.
When oversize loads can move in Maryland
Maryland's official sources set different travel hours, so follow the hours printed on your permit.
- COMAR's default: daylight only, from 30 minutes after sunrise to 30 minutes before sunset, with no moves after noon Saturday or on Sunday. The same rule lets MDOT SHA set other dates and hours in the permit.
- 24/7 moves: MDOT SHA's permit page says loads up to 225,000 lb, 13 ft 11 in wide, 14 ft 6 in high and 139 ft long can move 24/7. The Maryland One bulletin, as of November 2026, puts the width at 14 ft and requires a passing route.
- 14 ft wide or more: only from 9 a.m. to 3:30 p.m., on any highway.
- Beltways: on the Capital Beltway (I-495/I-95) and the Baltimore Beltway (I-695), some loads move only from 9 a.m. to 3:30 p.m. That covers loads over 45 tons, 100 ft or longer, or 12 ft or wider.
- Super loads: MDOT SHA lists day moves from 9 a.m. to 3:30 p.m. and night moves from 8 p.m. to 6 a.m.
- Weather: permits aren't valid when visibility is limited, when rain, sleet, snow, ice, fog, flood or wind makes travel hazardous, or during a snow emergency. If weather turns, park off the road until it clears.
- Detours: stay within 1 mile of the permitted route for rest, food, fuel or repairs.
Maryland holiday restrictions
MDOT SHA bans permit moves around New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas. Each 2026 ban runs from noon on the last business day before the holiday until 9:00 a.m. on the next business day after it.
| Holiday | No permit moves (MDOT SHA) |
|---|---|
| Thanksgiving 2026 | Noon Wednesday, November 25, to 9:00 a.m. Monday, November 30, 2026 |
| Christmas 2026 | Noon Thursday, December 24, to 9:00 a.m. Monday, December 28, 2026 |
| New Year's Day 2027 | Noon Thursday, December 31, 2026, to 9:00 a.m. Monday, January 4, 2027 |
MDOT SHA's permit limitations page also lists Good Friday as a no-travel day, but its 2026 holiday sheet doesn't. Check the 2027 sheet before you plan a move on Good Friday, March 26, 2027. The permit office also closes on some days when loads can still move, such as Columbus Day, Election Day and Veterans Day. Order permits early those weeks.
Maryland toll bridges and tunnels
Under COMAR, permit loads can use MDTA facilities only in daylight between 9 a.m. Monday and noon Friday, unless MDTA approves otherwise. Call the MDTA facility or police listed on your permit at least 1 hour before you arrive, and use the far-right lane at a toll plaza. These limits applied as of November 10, 2026.
| Crossing | Permit load limits |
|---|---|
| Baltimore Harbor Tunnel (I-895) | Nothing over 8 ft wide or 13 ft 6 in high |
| Fort McHenry Tunnel (I-95) | Nothing over 11 ft wide, 14 ft 6 in high, 85 ft long or 55 tons |
| Francis Scott Key Bridge (I-695) | Closed |
| Chesapeake Bay Bridge (US 50/301) | Up to 60 tons, 15 ft wide, 110 ft long and 15 ft 4 in high when two-way operation isn't in effect; police escort over 10 ft wide |
| Nice Bridge (US 301) | Nothing over 16 ft 9 in high; 11 ft or wider only 8 to 8:30 a.m. or 3:30 to 4 p.m. Monday to Thursday, and 8 to 8:30 a.m. Friday |
| Hatem Bridge (US 40) | Nothing over 10 ft wide during maintenance, 14 ft 1 in high or 120,000 lb |
During two-way operation on the Bay Bridge, loads over 13 ft wide wait until it ends. MDOT SHA's route restrictions list says loads within the Bay Bridge limits above can cross "at all times" outside two-way operation, which goes beyond COMAR's default hours. Follow the hours on your permit.
How to get a Maryland oversize permit
Maryland permits are ordered online in Maryland One, MDOT SHA's hauling permit system.
- Register. Create a Maryland One account from its login page.
- Apply. Enter the dimensions, weights, axle spacings and route. For a load 14 ft 6 in or taller, send the height clearance route survey with the application; the survey must also travel with the issued permit.
- Activate a super load. After approval, add the driver's name and phone number and resubmit it.
- Pay. MDOT SHA takes certified checks, money orders or approved credit cards, unless you have a credit bond or escrow account on file.
- Check restrictions and carry the permit. Read MDOT SHA's route restrictions list before every move, and keep the permit in the truck.
A state permit doesn't cover county or city roads. Frederick County, for example, asks for notice 3 to 5 business days before a move on its roads and may require a county permit.
Maryland oversize permit fees
MDOT SHA's fee table charges by gross weight.
| Permit or fee | Amount |
|---|---|
| Permit, up to 90,000 lb (45 tons) | $30 |
| Each additional ton over 45 tons | $5 |
| Permit at 120,000 lb (60 tons) | $105 |
| Permit at 150,000 lb (75 tons) | $180 |
| Engineering structural review, over 60 tons | $8 per structure; $20 per structure when MDOT SHA bridge engineers escort the move |
| MDOT SHA monitoring, when required | $200 per day |
| 5-day extension | $5 |
| Blanket permit | $50 for 30 days; $500 for a year |
| Book of 10 single-trip permits | $300 |
The sources disagree on where the weight fees start. MDOT SHA's fee table and the Transportation Article (§ 24-112) start the $5-per-ton charge above 45 tons, while COMAR 11.04.01.08 starts it above 40 tons.
A blanket permit suits repeat moves of one vehicle. It covers an oversize vehicle up to 75 ft long, 12 ft wide and 14 ft high, or special mobile equipment up to 90,000 lb. It lasts 30 days or a year, and you don't report each move.
Planning an oversize move through Maryland
Maryland's 13 ft 6 in height and 8 ft 6 in width match all five of its neighbors on main roads. Trailer length is where routes differ. Maryland allows a 53 ft semitrailer only on Interstates and designated truck routes, with 48 ft elsewhere. Pennsylvania allows 53 ft with a 41 ft kingpin-to-rear-axle limit. Virginia allows 53 ft when that distance is 41 ft or less, and 48 ft otherwise. Delaware allows 53 ft on Interstates, federal-aid primary and US routes. Washington, DC sets a 55 ft limit on the whole combination. Check every state on the route; see legal limits in all 50 states.
Lead time in Maryland depends on weight. A load over 120,000 lb needs at least 10 business days, and one over 500,000 lb needs 30. A tall load needs its route survey before the permit. Plan the Susquehanna River crossing early, too. The Hatem Bridge takes nothing over 10 ft wide during maintenance, and the Conowingo Dam (US 1) nothing over 11 ft wide.
Moving a load into, out of or across Maryland? Request a heavy haul quote with the dimensions, weight and route, or see our over dimensional freight service.